IMS IndustrieMontageService GmbH Logo
Best Practices

From Idea to Finished Product: End-to-End Solutions in Assembly Manufacturing

Markus Weber
20 min read

Complete solutions instead of individual services: How IMS accompanies you from development to series production. Sourcing, assembly, testing and logistics from a single source.

From Idea to Finished Product: End-to-End Solutions in Assembly Manufacturing

"Can you also handle procurement?" - "Who checks the quality?" - "How do the finished assemblies get to our customer?" We hear these questions daily. The answer: At IMS, you get everything from a single source.

The Problem of Fragmented Supply Chains

Classic Scenario in Many Companies:

You as a product developer have to juggle between:

  • Mechanics: Turned parts supplier in South Germany
  • Plastics: Injection molding manufacturer in Eastern Europe
  • Electronics: PCB assembler in Asia
  • Assembly: Assembly partner (maybe IMS?)
  • Packaging: Packaging manufacturer
  • Logistics: Freight forwarder to your end customer

The Problems:

  • 6 contact persons, 6 different delivery dates
  • Quality problems: Who is to blame? Finger-pointing!
  • Complex coordination for changes
  • High coordination effort
  • Risk of delivery delays (only 1 partner needs to default)
  • Capital commitment through warehousing between stages

The Alternative: End-to-End with IMS

One contact person. One delivery date. One invoice.

What Does "End-to-End" Mean at IMS?

Complete support through all phases:

Phase 1: Development & Engineering

What we do:

  • Design for Manufacturing (DFM) consultation
  • Design for Assembly (DFA) optimization
  • Cost optimization through standardization
  • Supplier suggestions based on experience
  • Prototype construction with fast iteration

Phase 2: Procurement & Sourcing

What we do:

  • Procurement of all components (mechanics, electronics, plastics)
  • Qualification and selection of suppliers
  • Negotiation of prices and conditions
  • Storage of components (consignment possible)
  • Incoming goods inspection and quality assurance

Phase 3: Assembly & Manufacturing

What we do:

  • Manual precision assembly
  • Bonding, screwing, snapping
  • Cable assembly and integration
  • Electronics assembly (SMD, THT) coordinated with partners
  • Final assembly with quality control

Phase 4: Testing & Quality Assurance

What we do:

  • Functional testing (electrical, mechanical)
  • Optical inspection (AOI if necessary)
  • Leak testing, pressure testing
  • Documentation (test reports, batch traceability)
  • Certification (CE, UL, FDA support)

Phase 5: Packaging & Logistics

What we do:

  • Customer-specific packaging (retail, transport, ESD)
  • Labeling and serialization
  • Storage (optional)
  • Shipping directly to your customers (dropshipping)
  • Just-in-time delivery

Practical Example 1: Medical Technology – From Idea to CE Certification

Customer: Startup from Mainz, develops mobile diagnostic device

Initial Situation:

  • First prototype exists (self-built)
  • Technology validated, but design not yet production-ready
  • Customer has no manufacturing, no suppliers, no QA
  • Goal: CE certification and market entry in 9 months

IMS End-to-End Solution:

Month 1-2: Engineering Phase

Tasks:

  • Analysis of prototype (reverse engineering)
  • Identification of 37 individual parts
  • DFM workshop: Optimization for series production
  • Result: 12 parts eliminated, 8 parts simplified → 17 final parts

Concrete Improvements:

  • Housing: Reduced from 6 screw types to 2
  • Wiring: Standardized connectors instead of soldering
  • Seal: Changed to standard component (instead of custom)

Output: Production-ready CAD data, bill of materials, assembly instructions

Month 3-4: Sourcing Phase

Tasks:

  • Procurement housing parts (plastic injection molding)
  • Procurement electronic components
  • Selection PCB assembler
  • Prepare cable assembly
  • Develop packaging

IMS coordinates:

  • Injection mold construction (China, monitored by IMS partner)
  • PCB layout coordinated with assembler
  • Design test adapter for functional testing

Output: All components procured, samples tested

Month 5-6: Prototype and Pre-Series Phase

Tasks:

  • Build 10 functional samples
  • Customer tests (2 weeks)
  • Incorporate feedback (minor changes)
  • Build 50 pre-series devices
  • Field test with pilot customers
  • Establish quality assurance process

IMS delivers:

  • Functioning prototypes despite tight schedule
  • Documentation for CE certification (assembly instructions, test reports)
  • Risk analysis (FMEA) for assembly process

Output: Devices successful in field test, CE process running

Month 7-9: Series Start-up

Tasks:

  • Start series of 500 devices
  • Finalize QA process
  • Complete CE certification (with documentation from IMS)
  • Delivery to first customers

IMS Performance:

  • Assembly of all 500 devices
  • 100% functional testing (electrical + software test)
  • Packaging with CE marking
  • Shipping directly to dealers (Germany, Austria, Switzerland)

Result after 9 months:

  • ✓ CE certification successful
  • ✓ 500 devices delivered
  • ✓ Zero complaints
  • ✓ Customer could focus on marketing & sales
  • ✓ Production costs 35% below original calculation (thanks to DFM)

Customer Feedback: "Without IMS, we wouldn't have made it. We had one contact person for everything – that was worth gold. The DFM optimizations saved us €40,000 in tooling costs."

Practical Example 2: Mechanical Engineering – Complex Control Unit

Customer: Mid-sized special machine builder from Frankfurt

Initial Situation:

  • Customer builds special machines, needs control units in small series (20-100 pieces)
  • Each machine is different → customer-specific variants
  • Previously in-house: 1.5 employees just for control assembly
  • Problem: Capacity bottlenecks, high costs, long lead times

IMS End-to-End Solution:

Analysis Phase (2 weeks)

Approach:

  • Visit customer, analyze current state
  • Typical control unit has 45 parts
  • Internal assembly time: 8 hours per unit
  • Material costs: approx. €1,200 per unit

IMS Proposal:

  • Modularization: 80% standard modules, 20% customer-specific
  • Outsourcing of complete assembly to IMS
  • Customer only provides specification, IMS does the rest

Implementation (ongoing for 2 years)

IMS takes over:

  1. Procurement:

    • Electronic components (control cabinets, PLCs, terminals)
    • Mechanical parts (housings, holders, fasteners)
    • Cable assemblies (according to customer specification)
  2. Storage:

    • Standard modules in stock (50 pieces)
    • Customer-specific parts ordered as needed
  3. Assembly:

    • Pre-assembly standard modules
    • Final assembly customer-specific (per order)
    • Assembly time at IMS: 5 hours (instead of 8 in-house)
  4. Testing:

    • Functional testing of all control units
    • Testing with customer-specific software
    • Test report for each unit
  5. Logistics:

    • JIT delivery to machine assembly at customer
    • Or direct shipping to end customer

Result:

  • Customer has 1.5 employees free for other tasks
  • Lead time halved (8 weeks → 4 weeks)
  • Cost per unit reduced by 15% (despite IMS margin!)
  • Quality improved (standardized process at IMS)

Customer Feedback: "IMS is basically our external assembly department. We treat them like internal colleagues, and it works perfectly."

The 7 Advantages of End-to-End Solution

1. One Contact Person for Everything

Instead of:

  • Call metalworker: "Where are the parts?"
  • Call electronics: "Are the PCBs ready?"
  • Call logistics: "When will it be delivered?"

Now:

  • Call IMS: "When is everything ready?" → one clear answer

Your advantage: Save time, less stress

2. Faster Time to Market

Without End-to-End:

  • Component A is ready (week 6)
  • Component B is ready (week 8)
  • Assembly can only start (week 8)
  • Testing (week 9)
  • Shipping (week 10)
  • Total: 10 weeks

With IMS End-to-End:

  • We coordinate all suppliers
  • Components arrive simultaneously
  • Assembly and testing overlap
  • Shipping directly after approval
  • Total: 6 weeks

Your advantage: 40% faster time-to-market

3. Quality Assurance Already at Components

Problem with fragmented supply chain:

  • Plastic part has dimensional error, only noticed during assembly
  • Query to suppliers takes 1 week
  • Reproduction takes 3 weeks
  • Loss: 4 weeks

With IMS End-to-End:

  • Incoming goods inspection of all components by IMS
  • Errors detected immediately (before assembly)
  • IMS clarifies with supplier (has direct line)
  • Customer only informed when problem is solved

Your advantage: Fewer unpleasant surprises, fewer delays

4. Cost Optimization Through Bundling

IMS can negotiate better prices than you:

  • We buy for many customers → larger quantities
  • We know alternative suppliers
  • We have long-term relationships

Example Connector:

  • Your price for individual purchase: €8
  • IMS price (framework agreement with distributor): €4.50
  • Savings: 44%

Your advantage: Often cheaper than self-procurement despite IMS margin

5. Scalability Without Investments

Your business grows:

  • From 100 pieces/year to 1,000 pieces/year

Without End-to-End:

  • You must invest: More warehouse, more personnel, more space

With IMS End-to-End:

  • We scale with you
  • No investments on your side necessary
  • We have capacities and suppliers

Your advantage: Growth without risk

6. Focus on Your Core Competency

What is your core competency?

  • Product development? Engineering? Marketing? Sales?

Probably not:

  • Supplier management
  • Optimize assembly processes
  • Perform quality inspections

With End-to-End:

  • We take over manufacturing → You focus on your business

Your advantage: More time for what you do best

7. Risk Minimization

Risks in supply chain:

  • Supplier failure
  • Quality problems
  • Customs problems (with overseas)
  • Currency risks

With IMS End-to-End:

  • We bear these risks
  • We have backup suppliers
  • We have experience with problem solving
  • You have contract with us, not with 10 sub-suppliers

Your advantage: Sleep better

What IMS is NOT

Clarification: We are not a general contractor that does everything itself.

What we do:

  • Coordination and management of supply chain
  • Qualification and selection of partners
  • Quality assurance
  • Assembly, testing, logistics

What partners do (coordinated by us):

  • Plastic injection molding
  • Metal processing (turning, milling)
  • PCB assembly (electronics)
  • Surface treatment (painting, anodizing)

Our Added Value:

  • We know the best partners for each task
  • We have long-term relationships
  • We coordinate everything → You have one contact person

Industry-Specific End-to-End Solutions

Medical Technology

Peculiarities:

  • Strict regulation (MDR, FDA)
  • Traceability critical
  • Sterile packaging often necessary

IMS End-to-End for Medical:

  • ISO 13485-compliant processes
  • Batch documentation
  • Support with technical documentation
  • Validation of assembly processes
  • Coordination with sterilization service providers

Mechanical Engineering

Peculiarities:

  • Individual projects (little repetition)
  • Complex assemblies
  • Technical consultation important

IMS End-to-End for Mechanical Engineering:

  • Flexible quantities (also individual pieces)
  • Engineering support (DFM/DFA)
  • Fast prototypes
  • Modularization consulting

Automotive

Peculiarities:

  • High volumes
  • Strict quality requirements (PPAP, FMEA)
  • Just-in-Sequence often required

IMS End-to-End for Automotive:

  • PPAP documentation
  • Layered Process Audits
  • Sequence-accurate delivery
  • Supplier qualification according to IATF 16949

Cost Models for End-to-End

Option 1: Flat Rate per Assembly

  • You pay X € per fully assembled product
  • Includes: Material, assembly, testing, packaging
  • Logistics billed separately

Advantage: Planability, simple calculation Disadvantage: Less transparent

Option 2: Open-Book Model

  • Material passed through (+ 5% handling fee)
  • Assembly per hourly rate
  • Testing flat rate per assembly
  • Packaging by effort

Advantage: Full transparency Disadvantage: More complex billing

Option 3: Mixed Model (our favorite)

  • Standard services flat rate (assembly, standard testing)
  • Material passed through
  • Special services by effort

Advantage: Good balance of transparency and simplicity

How to Start with End-to-End?

Step 1: Kickoff Meeting (on-site at your place or ours)

Duration: 2-3 hours

Agenda:

  • Presentation of your product/project
  • Analysis of current state (if already in production)
  • Your goals and requirements
  • Rough time planning
  • Clarification of technical questions

Output: Common understanding of project

Step 2: Quotation (1-2 weeks)

IMS creates:

  • Detailed effort estimate
  • Cost calculation (material + service)
  • Schedule
  • Risk analysis

Output: Binding offer

Step 3: Engineering Phase (2-6 weeks, depending on complexity)

Activities:

  • DFM/DFA workshop
  • Supplier scouting
  • Prototype construction
  • Validation

Output: Production-ready design

Step 4: Sourcing Phase (3-12 weeks, depending on components)

Activities:

  • Request for quotations from suppliers
  • Sample construction and testing
  • Tool construction (if necessary)
  • Zero series

Output: Qualified supply chain

Step 5: Series Start-up (1-2 months)

Activities:

  • First batch with increased QA
  • Process validation
  • Employee training
  • Optimization

Output: Stable series process

Step 6: Series (ongoing)

Regular Activities:

  • Production on call-off
  • Quality assurance
  • Continuous improvement (CIP)
  • Quarterly review meetings

Output: Satisfied customer, runs like clockwork

Typical Objections and Our Answers

"That's more expensive than doing it yourself!" Our experience: In 80% of cases, outsourcing is cheaper when considering total cost of ownership (personnel, space, warehouse, error costs, coordination effort).

"I'm giving up control!" Partly true. But: You have full transparency, regular reviews, and can visit on-site anytime. Control ≠ doing everything yourself.

"What if IMS no longer exists tomorrow?" Our team has 30+ years of experience at our Eltville site, and the company is owner-managed and solid. But: In the contract, we regulate transition scenarios. You get all supplier contacts and can theoretically take over.

"Our assembly is too special!" We have already manufactured thousands of different assemblies – from medical technology to mechanical engineering. Special cases are our strength.

"Small series don't pay off for end-to-end!" Especially small series! From 10 pieces per year, end-to-end can be worthwhile because the coordination effort for you is eliminated.

Checklist: Is End-to-End Right for You?

✓ Yes to 5+ points → End-to-End with IMS is ideal

  • [ ] We currently have more than 5 different suppliers for one product
  • [ ] Coordination costs us > 1 man-day per week
  • [ ] We had delivery problems in the last 12 months
  • [ ] Our quantities are small to medium (10-10,000 pieces/year)
  • [ ] We want to focus on engineering/marketing/sales
  • [ ] Quality assurance is currently a challenge
  • [ ] We want to be faster to market
  • [ ] We want to scale without large investments
  • [ ] We value personal contact and regional proximity

Conclusion: Simplify Your Supply Chain

In a complex world, simplicity is valuable. End-to-end solutions reduce your complexity:

  • Fewer contact persons
  • Less coordination effort
  • Fewer risks
  • More time for your core business

IMS as Your Partner:

  • ✓ 30+ years of team experience
  • ✓ Established supplier networks
  • ✓ Central location in Rhine-Main region
  • ✓ Working in accordance with ISO 9001
  • ✓ Personal contact person
  • ✓ Transparent and reliable

Your Next Step:

Let's talk about your project. In a non-binding conversation, we analyze:

  • Is end-to-end sensible for you?
  • What could a solution look like?
  • What would it cost?
  • How long would it take?

Contact:

  • Phone: +49 6129 50 29 39 0
  • Email: office@ims-lohnfertigung.de
  • Or visit us in Eltville am Rhein

IMS IndustrieMontageService – Your Partner from Idea to Finished Product.

About the Author

Markus Weber

Produktionsleiter / Production Manager

Markus optimiert unsere Produktionsprozesse und koordiniert komplexe Montageprojekte mit höchster Effizienz.

Topics

End-to-End
Complete Solution
Sourcing
Supply Chain Management
Assembly Manufacturing

Do you have questions about this topic?

Contact us for a non-binding consultation.