Just-in-Time Manufacturing for Wiesbaden and Frankfurt: Flexibility Without Warehousing
How companies from Wiesbaden and Frankfurt save storage costs through JIT manufacturing while maintaining maximum delivery flexibility. Practical examples and strategies.
Just-in-Time Manufacturing for Wiesbaden and Frankfurt: Flexibility Without Warehousing
In the metropolitan areas of Wiesbaden and Frankfurt, companies struggle with rising real estate costs. At the same time, customers demand increasingly shorter delivery times. Just-in-Time (JIT) manufacturing offers the solution – if the partner is close enough.
The Problem: Warehousing Becomes a Cost Driver
Reality in Wiesbaden and Frankfurt:
- Commercial space costs €12-18/m² monthly rent
- A 100 m² warehouse devours €1,440-2,160 per month = €17,280-25,920 per year
- Additionally: Insurance, warehouse management, capital commitment, risk of obsolescence
Example Calculation for a Mid-Sized Company:
| Item | Cost/Year | |------|-----------| | Warehouse space 150 m² | €21,600 | | Warehouse personnel (0.5 FTE) | €28,000 | | Insurance | €3,500 | | Capital commitment (Avg. €80,000 @ 4%) | €3,200 | | Obsolescence/waste | €5,000 | | Total | €61,300 |
The Question: Is this necessary?
What is Just-in-Time Manufacturing?
Definition: Just-in-Time means that components or assemblies are produced and delivered exactly when they are needed – not earlier, not later.
Core Principles:
- Demand-based production – only what is needed
- Minimal inventory – ideally zero
- Short lead times – fast response to demand
- High delivery reliability – reliability is critical
- Close supplier integration – partner, not just supplier
Why Geographic Proximity is Critical for JIT
JIT only works with regional partners:
1. Transport Time is Critical
- Overseas manufacturing: 4-8 weeks delivery time → JIT impossible
- Eastern Europe: 5-10 days → limited JIT
- IMS Eltville → Frankfurt/Wiesbaden: 30-45 minutes → true JIT
2. Planning Security Through Short Distances
With a partner in China, you plan 2-3 months ahead. With IMS in Eltville, 48 hours is often sufficient.
3. Emergency Flexibility
"We need 50 additional pieces tomorrow" – possible with regional partner, unthinkable with overseas supplier.
The IMS Just-in-Time Model for Wiesbaden and Frankfurt
Our JIT Solutions:
Model 1: Standard JIT with Daily Delivery
Suitable for: Regular, plannable demand
How it works:
- Framework contract with annual demand (e.g., 2,400 assemblies)
- Weekly or daily call-off quantities (e.g., 50 per day)
- Material ready at our facility
- Production after call-off
- Delivery next day
Example Wiesbaden – Medical Technology:
- Company: Manufacturer of diagnostic devices
- Annual demand: 1,800 control modules
- Old: Inventory 300 pieces = €45,000 capital commitment
- New with IMS JIT: Inventory 20 pieces = €3,000 capital commitment
- Savings: €42,000 capital commitment + €8,000 warehouse space = €50,000/year
Model 2: Consignment Stock
Suitable for: Fluctuating demand with peak loads
How it works:
- IMS produces and stores finished assemblies
- Customer pays only upon removal from storage
- Minimum and maximum stock levels are agreed
- IMS automatically replenishes
- Customer can call off at any time
Advantages:
- Zero warehouse space at customer
- No capital tied up until removal
- Maximum flexibility in call-off
- IMS carries inventory risk
Example Frankfurt – Mechanical Engineering:
- Company: Special machine construction
- Annual demand: 500 drive modules (very irregular)
- Consignment stock at IMS: 100 pieces in stock
- Customer pays only when calling off
- Average call-off: 10-15 pieces/week
- Savings: Total warehousing costs + full flexibility
Model 3: Emergency Response (Emergency JIT)
Suitable for: Unplannable demands, prototypes, special orders
How it works:
- No framework contract necessary
- Customer reports urgent need
- IMS checks feasibility (usually: yes)
- Production starts within hours
- Express delivery or self-pickup
Real Case Frankfurt-Höchst – Chemical Plant:
- Friday 3 PM: Control unit in production plant defective
- Friday 4 PM: Technical manager drives to IMS with defective part
- Friday 4:30 PM: IMS begins reverse engineering
- Saturday 10 AM: First tests
- Saturday 2 PM: Finished replacement unit
- Saturday 4 PM: Plant running again
Production downtime avoided: Value approx. €80,000 (weekend shutdown)
The 5 Success Factors for JIT with IMS
1. Precise Demand Forecasting
Your Task:
- Provide rolling 3-month forecast
- Weekly call-offs preferably 5 days in advance
- In case of changes: communicate immediately
IMS Task:
- Material stocking based on forecast
- Capacity planning for your products
- Plan buffer for fluctuations
2. Digital Integration
EDI Connection (Electronic Data Interchange):
- Your ERP system communicates directly with our system
- Automatic call-offs
- Real-time status tracking
- Reduces errors and effort
Or simpler:
- Weekly Excel call-offs via email
- Phone coordination for changes
3. Quality Assurance Upfront
The Problem: JIT tolerates no quality defects. If 50 parts are delivered today and one is defective, one is missing.
IMS Solution:
- 100% incoming inspection
- 100% final inspection
- Random samples by quality management
- For critical assemblies: additional intermediate inspections
4. Redundant Delivery Routes
Risk Minimization:
- Standard: Own delivery with IMS vehicle
- Backup: Courier service (in case of vehicle failure)
- Emergency: Customer picks up themselves (express case)
5. Continuous Improvement
Quarterly Reviews:
- Analyze delivery reliability
- Optimize processes
- Improve demand forecasts
- Identify cost optimizations
Industry-Specific JIT Strategies
Medical Technology (strong in Wiesbaden/Mainz)
Peculiarities:
- Batch traceability critical
- Sterile packaging often necessary
- Product liability requires complete documentation
IMS Solution:
- Complete batch documentation
- Traceability down to individual component
- ISO 13485-compliant processes
- Clean room assembly available
Mechanical Engineering (strong in Frankfurt/Rhine-Main)
Peculiarities:
- Project business with irregular demand
- Customer-specific variants
- Often individual parts or very small series
IMS Solution:
- No minimum quantities
- Fast changeover to variants
- Modular design enables flexibility
- Consignment stock for standard modules
Automotive (Rüsselsheim, Frankfurt)
Peculiarities:
- High volumes
- Strict quality requirements (IATF 16949)
- Just-in-Sequence often required
IMS Solution:
- Sequence-accurate delivery possible
- PPAP documentation
- Layered Process Audits
- Close timing (multiple times daily)
Cost Comparison: Traditional Warehousing vs. JIT with IMS
Example Company: 100 employees, 500 assemblies/month
Scenario A: Traditional Warehousing
| Item | Cost/Year | |------|-----------| | 3 months inventory | €120,000 (capital commitment @ 4%) | | Warehouse space 80 m² | €14,400 | | Warehouse management | €25,000 | | Insurance | €2,000 | | Obsolescence (2% p.a.) | €6,000 | | Total | €167,400 |
Scenario B: JIT with IMS Eltville
| Item | Cost/Year | |------|-----------| | Inventory (1 week) | €3,200 (capital commitment) | | Warehouse space 10 m² | €1,800 | | JIT surcharge per assembly (€5) | €30,000 | | Total | €35,000 |
Savings: €132,400 per year
Note: JIT surcharge covers increased coordination effort and smaller lot sizes at IMS
Typical Objections and How We Solve Them
"JIT is too risky – what if IMS can't deliver?"
Our Safeguards:
- Redundant suppliers for critical components
- Safety stock for your products (coordinated)
- Insurance for business interruption
- 30+ years of team experience – we know what's critical
- Backup plans for all emergency scenarios
Numbers speak:
- IMS delivery reliability: 99.7% over the last 3 years
- Average delay for the 0.3%: 4 hours
"Our demand fluctuates too much for JIT"
Solution: Flexible JIT Model
- Base quantity as fixed call-off (e.g., 60% of demand)
- Flex quantity with 48h lead time (another 30%)
- Express quantity with 24h lead time (10%)
This way you combine planability with flexibility.
"We're too small for JIT"
Wrong! JIT is especially worthwhile for SMEs:
- No minimum quantities at IMS
- Even 10 pieces per week is JIT
- Relative cost savings often higher for SMEs
Example Small Company Wiesbaden:
- 20 employees, 80 assemblies/month
- Before JIT: 12 m² warehouse = €2,160/year + capital commitment €8,000
- With JIT: Only 2 m² = €360/year + capital commitment €800
- Savings: €9,000/year – significant for a small company!
Implementation in 4 Steps
Phase 1: Analysis (Week 1-2)
- Current state analysis of your warehousing
- Identification of JIT-suitable assemblies
- Create demand forecast
- Cost-benefit calculation
Output: JIT concept with ROI calculation
Phase 2: Pilot Project (Month 1-3)
- Start with one assembly
- Establish weekly call-offs
- Fine-tune processes
- Collect lessons learned
Output: Functioning JIT for pilot product
Phase 3: Roll-out (Month 4-6)
- Expansion to additional assemblies
- Digital integration (EDI)
- Process optimization
- Training your employees
Output: Complete JIT system
Phase 4: Optimization (from Month 7)
- Continuous improvement
- Further cost reductions
- Increase delivery reliability
- Reduction of safety stock
Output: Lean supply chain
Checklist: Is Your Company JIT-Ready?
✓ Yes to 6+ points → JIT with IMS is ideal for you
- [ ] We are in the Rhine-Main region (Frankfurt, Wiesbaden, Mainz, vicinity)
- [ ] Our warehousing costs are significant (> €20,000/year)
- [ ] We can forecast demand fairly reliably (3 months)
- [ ] We manufacture series or have regular demand
- [ ] Capital commitment is an issue for us
- [ ] We want to reduce warehouse space
- [ ] Our assemblies are not extremely perishable
- [ ] We value personal contact with suppliers
- [ ] Flexibility is more important to us than minimal unit price
- [ ] We are open to new logistics concepts
Conclusion: JIT is Closer Than You Think
Just-in-Time manufacturing is not a luxury for large corporations, but a realistic option for companies of any size – if the partner is close enough.
The combination of:
- ✓ IMS only 30-45 minutes from Wiesbaden/Frankfurt
- ✓ 30+ years of team experience in flexible manufacturing
- ✓ No minimum quantities
- ✓ High delivery reliability (99.7%)
- ✓ Personal service
... makes us the ideal JIT partner for your production.
Next Step: JIT Check (free)
We analyze your current inventory situation and calculate how much you can save with JIT:
- Inventory assessment (30-minute phone call)
- Analysis by our team
- Presentation of savings potential + JIT concept
- Decision without risk
Contact us:
- Phone: +49 6129 50 29 39 0
- Email: office@ims-lohnfertigung.de
- Or visit us in Eltville (the trip is worth it!)
Just-in-Time. Just in Eltville. Just for You.