Lean Manufacturing in Assembly: Eliminating Waste

Markus Weber
11 min read

Lean principles increase efficiency even in manual assembly. Learn how to identify and eliminate waste.

Lean Manufacturing in Assembly: Eliminating Waste

Lean Manufacturing originated in the automotive industry but is also highly effective in manual precision assembly. At IMS, we have adapted Lean principles and achieve efficiency improvements of 20-40%.

The 7 Types of Waste (Muda)

1. Overproduction

Definition: Producing more than needed

In assembly:

  • Too large lot sizes
  • Production without concrete order
  • "Safety" stocks

Our solution:

  • Just-in-time production
  • Pull systems
  • Kanban for repeat orders

2. Waiting

Definition: Unused time without value creation

Typical causes:

  • Missing materials
  • Machine failures
  • Unbalanced processes
  • Approvals

Our solution:

  • Optimized material provision
  • Poka-yoke systems
  • Process balancing
  • Interface optimization

3. Unnecessary Transport

Definition: Movement of material without value creation

In assembly:

  • Long way between assembly and testing
  • Multiple relocations
  • Unfavorable layouts

Our solution:

  • U-shaped cell organization
  • Material at point-of-use
  • One-piece flow where possible

4. Over-processing

Definition: Doing more than customer requires

Examples:

  • Too tight tolerances
  • Unnecessary inspection steps
  • Superfluous documentation

Our solution:

  • Value stream mapping
  • Customer requirement analysis
  • Standardization

5. Excess Inventory

Definition: Too much material in stock

Problems:

  • Capital tied up
  • Obsolescence risk
  • Storage costs
  • Obsolescence with design changes

Our solution:

  • Supplier managed inventory (SMI)
  • Consignment warehouse
  • Small lot sizes

6. Unnecessary Motion

Definition: Ergonomically unfavorable work steps

Examples:

  • Reaching far
  • Bending and stretching
  • Tool search
  • Complicated access

Our solution:

  • Ergonomic workstations
  • 5S system
  • Tools within reach
  • Height-adjustable tables

7. Defects and Rework

Definition: Quality defects requiring correction

Costs:

  • Direct rework costs
  • Time loss
  • Demotivation
  • Customer complaints

Our solution:

  • Poka-yoke (error-proofing)
  • Quality at the source
  • Immediate response to errors
  • Root cause analysis (5-Why)

5S: The Foundation for Lean

1. Sort (Seiri)

  • Remove unnecessary items
  • Only needed items at workplace
  • Regular sorting out

2. Set in Order (Seiton)

  • Fixed place for everything
  • Shadow boards for tools
  • Visual markings
  • "One grip" principle

3. Shine (Seiso)

  • Keep workplace clean
  • Cleaning = inspection
  • Detect problems early

4. Standardize (Seiketsu)

  • Standards for 1-3
  • Visual controls
  • Checklists

5. Sustain (Shitsuke)

  • Maintain standards
  • Continuous improvement
  • Audits

At IMS:

  • 5S audits weekly
  • Visualization everywhere
  • Every employee responsible

Value Stream Mapping

Visualize Process

  1. Capture current state

    • Document all steps
    • Measure times
    • Identify waste
  2. Define future state

    • Eliminate waste
    • Reduce lead time
    • Increase value creation
  3. Implementation plan

    • Set priorities
    • Implement quick wins
    • Plan long-term improvements

Practical Example

Current:

  • Lead time: 5 days
  • Value-added time: 2 hours
  • Waiting times: 90%

Future:

  • Lead time: 2 days
  • Value-added time: 2 hours (same)
  • Waiting times: 75% (reduced)

Measures:

  • Material closer to assembly
  • Parallel instead of sequential testing
  • Faster approval processes

Takt Time and Flow Production

Calculate Takt Time

Formula: Takt Time = Available Time / Customer Demand

Example:

  • Available time: 8h × 60min = 480 min
  • Customer demand: 40 pieces/day
  • Takt time: 480 / 40 = 12 min/piece

Meaning: Every 12 minutes a part must be finished.

One-Piece Flow

Advantages:

  • Minimal lead time
  • Problems immediately visible
  • Little work-in-process (WIP)

When possible:

  • Balanced process times
  • High process stability
  • Low setup times

Kaizen: Continuous Improvement

Kaizen Workshops

Format:

  • 3-5 days intensive
  • Cross-functional team
  • Focus on one topic
  • Immediate implementation

At IMS:

  • 2-3 Kaizen events per year
  • Employee suggestions welcome anytime
  • Rewards for implemented ideas

PDCA Cycle

Plan:

  • Identify problem
  • Analyze causes
  • Plan solution

Do:

  • Implement pilot
  • Test

Check:

  • Measure results
  • Evaluate

Act:

  • Standardize
  • Look for further potential

Poka-Yoke: Error-Proofing

Examples from Our Practice

Mix-up Protection:

  • Different connectors have different colors
  • Sensors detect wrong parts

Assembly Aids:

  • Asymmetric fixtures
  • Only one orientation possible

Counting Aids:

  • Provision with exact quantity
  • No components should remain

Visual Management

Andon System

Visualization of problems:

  • Green: All OK
  • Yellow: Support needed
  • Red: Production stop

Shopfloor Boards

Daily information:

  • Production goals
  • Current piece counts
  • Quality metrics
  • Improvement ideas

KPI Dashboards

Real-time information:

  • OEE (Overall Equipment Effectiveness)
  • First-pass yield
  • Lead times
  • Customer satisfaction

Case Study: 40% Efficiency Increase

Initial Situation:

  • Complex assembly, 50 parts
  • Assembly time: 45 minutes
  • Frequent search times
  • Error rate: 2%

Lean Measures:

  1. 5S at workplace (Week 1)
  2. Material supermarket set up (Week 2)
  3. Poka-yoke fixtures (Week 3-4)
  4. Work instructions optimized (Week 4)
  5. Training of all assemblers (Week 5)

Result after 2 months:

  • Assembly time: 27 minutes (-40%)
  • Search times: eliminated
  • Error rate: 0.3%
  • ROI: 3 months

Lean and Digitalization

Industry 4.0 Meets Lean

Synergies:

  • Digital value stream analysis
  • Real-time OEE tracking
  • Predictive maintenance
  • Paperless production

At IMS in implementation:

  • Digital work instructions (tablets)
  • Barcode scanning for material
  • Automatic time recording
  • Cloud-based evaluations

Pitfalls and Solutions

Pitfall 1: "Lean is only for large series"

Wrong! Lean principles are universal:

  • 5S works everywhere
  • Waste exists even at lot size 1
  • Standardization helps even with variance

Pitfall 2: "Too expensive to implement"

Counterargument:

  • Many Lean measures cost nothing (5S, visual management)
  • ROI often in months
  • Employee motivation priceless

Pitfall 3: "Employees don't participate"

Solution:

  • Involve from the beginning
  • Develop improvements together
  • Celebrate successes
  • Training and education

Conclusion: Lean is a Journey, Not a Destination

Lean Manufacturing is not a one-time action, but a corporate culture. At IMS, we have been living Lean for over 10 years and continuously improve.

Results:

  • 30% higher productivity
  • 50% less lead time
  • 80% fewer errors
  • More satisfied employees

Interested in Lean? Visit us for a factory tour and see Lean in action.

About the Author

Markus Weber

Produktionsleiter / Production Manager

Markus optimiert unsere Produktionsprozesse und koordiniert komplexe Montageprojekte mit höchster Effizienz.

Topics

Lean Manufacturing
Efficiency
Kaizen
5S

Do you have questions about this topic?

Contact us for a non-binding consultation.